The Garden Bridge project, providing a new pedestrianised bridge across the River Thames, has come in for much criticism due to its procurement process, purpose and escalating costs.
In July 2016, the architect Crispin Wride revealed his alternative concept to Thomas Heatherwick’s design. Wride, of Crispin Wride Architects Design Studio Ltd. (CWADS), has proposed a garden crossing that would use the existing piers that stand redundant between Blackfriars Road Bridge and the Station Bridge.
The vacant piers and their potential reuse was an issue that had first preoccupied Wride when he was involved in the design of the Blackfriars station north concourse building.
His design proposal, rather than providing a simple route from one side of the river to the other, is instead based upon the idea of stepping stones or a series of islands.
Each island deck would occupy one of the pairs of existing piers, linked to its neighbours as a form of artificial ‘archipelago’, and connected back to the road bridge at the piers, thereby enhancing access and flexibility of use.
Wride has designed the independent decks as prefabricated leaf-shaped gardens, approximately 45 m x 30 m. These would be propped and cantilevered from the piers with lightweight bridges simply supported between them. By raising the ‘leaves’ above the road level they would allow views west along the river, and ‘visual interaction with the station platforms to the east’. The western half of each deck would form a landscaped prow with access rising through the deck.
As the road bridge rises and falls along its length, the connection might vary at each deck, and some might have lower decks slung within the ribs of the structure beneath. The eastern end of the decks could be occupied by small pavilions with the potential for accommodating facilities such as galleries, cafes or hired spaces for corporate events.
Wride claims the cost of reusing the existing piers would be less than that of the entirely new crossing. The offsite prefabrication of the components could allow for a quick and economic construction process.
Rather than providing a straight route, the architect said that it could create ‘a dynamic new experience of crossing the river...enhancing the existing awkward space left between the road and rail bridges...and adding four new spectacular public spaces for London, poised above the River Thames’.
All concepts and images are the copyright of CWADS Ltd.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.